Abstract
This manuscript suggests quasi-oppositional fast convergence evolutionary programming (QOFCEP) technique to determine short-term generation scheduling of fixed head hydrothermal system comprising pumped storage hydro plants (PSHPs), solar PV plants (SPVPs) and wind turbine generators (WTGs) with demand response program (DRP). PSHPs are used with fixed head hydro power plants (FHPPs), thermal generating units (TGUs), SPVPs and WTGs to operate system conveniently. Uncertainties related to renewable generations and load demands have been considered. Self-adaptive tent mapped scenarios of uncertain parameters are generated within higher level of confidence space to deal with the system uncertainties. DRP is applied to level the load demand curve and to enhance system flexibility and reduce operational cost. Numerical results of typical test system are matched with those attained by fast convergence evolutionary programming (FCEP) and evolutionary programming (EP).
| Original language | English |
|---|---|
| Pages (from-to) | 4180-4191 |
| Number of pages | 12 |
| Journal | IET Generation, Transmission and Distribution |
| Volume | 18 |
| Issue number | 24 |
| DOIs | |
| Publication status | Published - Dec 2024 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- demand response program
- fixed head hydro plant
- pumped storage hydro plant
- solar PV plant
- thermal generators
- uncertainty
ASJC Scopus subject areas
- Control and Systems Engineering
- Energy Engineering and Power Technology
- Electrical and Electronic Engineering
Fingerprint
Dive into the research topics of 'Fixed head hydrothermal scheduling considering uncertainty of load demand and renewable energy sources'. Together they form a unique fingerprint.Press/Media