Abstract
In this article, we attempt to solve cellular manufacturing system (CMS) scheduling problem from group technology point of view. Since the operations of a job in a CMS can be performed on more than one machine within a cell, the scheduling problem of the CMS is always considered as a computationally hard problem. Two approaches called fuzzy logic and fuzzy MAX-MIN ant system are employed respectively. Under the consideration of multiple criteria, the performance of different manufacturing cells in a CMS is improved by means of proposed methodologies.
| Original language | English |
|---|---|
| Title of host publication | 2010 IEEE World Congress on Computational Intelligence, WCCI 2010 |
| DOIs | |
| Publication status | Published - 2010 |
| Event | 2010 6th IEEE World Congress on Computational Intelligence, WCCI 2010 - Barcelona, Spain Duration: 18 Jul 2010 → 23 Jul 2010 |
Publication series
| Name | 2010 IEEE World Congress on Computational Intelligence, WCCI 2010 |
|---|
Conference
| Conference | 2010 6th IEEE World Congress on Computational Intelligence, WCCI 2010 |
|---|---|
| Country/Territory | Spain |
| City | Barcelona |
| Period | 18/07/10 → 23/07/10 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
ASJC Scopus subject areas
- Artificial Intelligence
- Computational Theory and Mathematics
Fingerprint
Dive into the research topics of 'Cellular manufacturing system scheduling under fuzzy constraints: A group technology perspective'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver