Skip to main navigation Skip to search Skip to main content

Cellular Manufacturing System Scheduling under Fuzzy Constraints: a Group Technology Perspective

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

In this article, we attempt to solve cellular manufacturing system (CMS) scheduling problem from group technology point of view. Since the operations of a job in a CMS can be performed on more than one machine within a cell, the scheduling problem of the CMS is always considered as a computationally hard problem. Two approaches called fuzzy logic and fuzzy MAX-MIN ant system are employed respectively. Under the consideration of multiple criteria, the performance of different manufacturing cells in a CMS is improved by means of proposed methodologies.

Original languageEnglish
Title of host publication2010 IEEE International Conference on Fuzzy Systems, FUZZ 2010
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781424469208
DOIs
Publication statusPublished - 2010
Event2010 IEEE International Conference on Fuzzy Systems, FUZZ 2010 - Barcelona, Spain
Duration: 18 Jul 201023 Jul 2010

Publication series

NameIEEE International Conference on Fuzzy Systems
ISSN (Print)1098-7584

Conference

Conference2010 IEEE International Conference on Fuzzy Systems, FUZZ 2010
Country/TerritorySpain
CityBarcelona
Period18/07/1023/07/10

ASJC Scopus subject areas

  • Software
  • Theoretical Computer Science
  • Artificial Intelligence
  • Applied Mathematics

Fingerprint

Dive into the research topics of 'Cellular Manufacturing System Scheduling under Fuzzy Constraints: a Group Technology Perspective'. Together they form a unique fingerprint.

Cite this