@inbook{280ecb077a334492a27fd8298a109641,
title = "Causes of Conflict in the South African Construction Industry",
abstract = "The objective of this research was to determine the causes of dispute and conflict within the South African construction industry. The research begins by looking at the reviewed literature. The data was collected through a questionnaire that was distributed to construction professionals based in South Africa. Ninety-one (91) questionnaires were received from one hundred and twenty (120) sent out, 76 per cent response rate. A mean item score was used to rank the findings. Based on the score ranking from the causes of conflict in the south African construction industry. Design errors as a cause revealed that the cheap design team hired instead of the quality design team was ranked 3,79, followed by an inadequate briefing of the design team which was ranked 3,67, ranked last was inept design team with a rank of 3,47. This study revealed that contract variations are the number one cause of conflict; this is a known fact as the South African construction industry is known to have a problem with a budget overrun. It is recommended that clients must ensure that their demand for design changes during the construction period should have no adverse effects on the critical activities to avoid causing delays.",
keywords = "Communication, Conflict, Construction industry, Dispute, Project",
author = "Matthieu Bodika and Clinton Aigbavboa and Ifije Ohiomah and Nita Sukdeo",
note = "Publisher Copyright: {\textcopyright} 2022. Published by AHFE Open Access. All rights reserved.",
year = "2022",
doi = "10.54941/ahfe1002227",
language = "English",
series = "Applied Human Factors and Ergonomics International",
publisher = "AHFE International",
pages = "19--23",
booktitle = "Applied Human Factors and Ergonomics International",
}