Abstract
This article provides a picture of the latest developments in providing BIM-based tools for construction and demolition waste (CDW) management. The coverage and breadth of the literature on offering BIM-based tools and technologies for dealing with CDW throughout the whole life cycle of construction are investigated, and gaps are identified. Findings reveal that, although various BIM-based technologies are closely associated with CDW, much of the existing research on this area has focused on the design and construction phase; indeed, the problem of CDW in post-construction stages has received scant attention. Besides, the now available tools and technologies are lacking in cross-phase insights into project waste aspects and are weak in theoretical rigor. This article contributes to the field by identifying the intellectual deficiencies in offering BIM-based tools and technologies when dealing with CDW. So, too, it points to major priorities for future research on the topic. For practitioners, the study provides a point of reference and raises awareness in the field about the most advanced available BIM-based technologies for dealing with CDW problems.
Original language | English |
---|---|
Article number | 8427 |
Journal | Sustainability |
Volume | 13 |
Issue number | 15 |
DOIs | |
Publication status | Published - 1 Aug 2021 |
Externally published | Yes |
Keywords
- Algorithm
- Application program interface (API)
- Building information modeling
- Data mining
- Digital engineering
- Sustainable construction
ASJC Scopus subject areas
- Geography, Planning and Development
- Renewable Energy, Sustainability and the Environment
- Environmental Science (miscellaneous)
- Energy Engineering and Power Technology
- Management, Monitoring, Policy and Law