TY - JOUR
T1 - A proposed simulation-based theoretical preconstruction process
T2 - The case of solar photovoltaic technology in South African shopping centres
AU - van Vuuren, Dirk Johan
AU - Marnewick, Annlizé
AU - Pretorius, Jan Harm C.
N1 - Publisher Copyright:
© 2019 Elsevier Ltd
PY - 2019/10
Y1 - 2019/10
N2 - At present, simulation processes for determining the yield of PV plants are fairly unstructured. This research proposes a structured pre-assessment process to increase the electricity yield of a PV plant in South Africa throughout its life cycle. Furthermore, enhanced electricity yield and increased accuracy in estimating the yield of such a plant will result in a higher degree of return on investment, and reduce the propability of legal disputes between the parties involved. A shopping centre, consuming approximately 5000 kVA under maximum load, in Johannesburg, Gauteng, was used as a case study to apply the proposed pre-assessment of a solar PV plant. The pre-assessment includes analysing the load demand of the shopping centre (without the presence of the solar PV plant), relating that to the seasonal change and the subsequent average ambient temperature variation and conducting simulations in PVSyst 6.7.9 by permuting various variables within the software. The variables include investigating the effect of PV module orientation adjustment, the effect of PV module degradation on electricity yield over its lifespan and the effect of increasing the array-to-inverter ratio (DCpower/ACpower). The research found that by implementing the process, the electricity yield and return on investment will be increased.
AB - At present, simulation processes for determining the yield of PV plants are fairly unstructured. This research proposes a structured pre-assessment process to increase the electricity yield of a PV plant in South Africa throughout its life cycle. Furthermore, enhanced electricity yield and increased accuracy in estimating the yield of such a plant will result in a higher degree of return on investment, and reduce the propability of legal disputes between the parties involved. A shopping centre, consuming approximately 5000 kVA under maximum load, in Johannesburg, Gauteng, was used as a case study to apply the proposed pre-assessment of a solar PV plant. The pre-assessment includes analysing the load demand of the shopping centre (without the presence of the solar PV plant), relating that to the seasonal change and the subsequent average ambient temperature variation and conducting simulations in PVSyst 6.7.9 by permuting various variables within the software. The variables include investigating the effect of PV module orientation adjustment, the effect of PV module degradation on electricity yield over its lifespan and the effect of increasing the array-to-inverter ratio (DCpower/ACpower). The research found that by implementing the process, the electricity yield and return on investment will be increased.
KW - Angle of tilt
KW - Array-to-inverter ratio
KW - Module degradation
KW - Orientation
KW - Photovoltaic
UR - http://www.scopus.com/inward/record.url?scp=85069928617&partnerID=8YFLogxK
U2 - 10.1016/j.rser.2019.109295
DO - 10.1016/j.rser.2019.109295
M3 - Article
AN - SCOPUS:85069928617
SN - 1364-0321
VL - 113
JO - Renewable and Sustainable Energy Reviews
JF - Renewable and Sustainable Energy Reviews
M1 - 109295
ER -